浅谈水轮发电机组的试运行 预览

Talking about the Trial Operation of the Hydroelectric Generating Unit
在线阅读 下载PDF
收藏 分享 导出
摘要 水电站新安装机组或在大修完成后,应对机组的安装及检修质量进行检验,即试运行并合格后方可投入正常运行.一般由电厂总工程师负责主持,新装机组还必须成立启动验收委员会领导试运行工作,对机组试运行的条件、程序、试验项目,质量标准等做全面的试验分析,以保证机组正式运行时安全,经济. After the completion of the newly installed unit or overhaul of the hydropower station,the installation and maintenance quality of the unit should be inspected,that is,after trial operation and passing the test,it can be put into normal operation.Generally,it is presided over by the chief engineer of the power plant.The newly installed unit must also set up the pilot operation of the start acceptance committee,and conduct comprehensive test analysis on the conditions,procedures,test items and quality standards of the unit trial operation to ensure the safety of the unit when it is officially operated.economic.
作者 唐琦云 Tang Qi-yun(不详)
出处 《电力系统装备》 2019年第10期103-104,共2页 Electric Power System Equipment
关键词 发电机组 调速器 空载 负荷 过速 升压 generator set governor no load load overspeed boost
  • 相关文献
投稿分析

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部 意见反馈